Build Times
How Long a Build Actually Takes
Every build gets cut, weighed, and re-checked on the beam in-house. Here's an honest turnaround estimate by category.
Single Club
2–4 business days. Driver, fairway wood, hybrid, wedge, or putter, once the beam session confirms a build spec.
Iron Set
5–8 business days. Every head shafted and weighed against the set target, then re-checked on the beam before it leaves the lab.
Full Bag
8–12 business days. Driver through putter, built and re-checked for swingweight continuity as each piece comes together.
Why a Quote Sometimes Runs Longer
Special-order heads or finishes can add a week while they ship in from the distributor. Occasionally a first build comes off the bench slightly outside the target swingweight band — we catch that on the beam re-check and correct it before handoff, which can add a day.
Same-Week Builds When the Parts Are on the Shelf
If everything on your spec sheet is already in stock, ask about a same-week turnaround at the time of your session. It isn't always possible, but when the components are on hand there's rarely a reason to wait.
Get a Spec Sheet First
Every build starts with a beam session, not a build-time guess.